CRUSHER SCREENER.

 Be able to operate the machine safely and correctly in accordance with manufacturers’

instructions and accepted good practice.

· Carry out a pre-shift inspection.

· Be able to operate safely under varying site conditions.

· Be able to carry out minor adjustments and routine services.

 

Course Summary

 

· An Introduction to the plant

· Current relevant regulations

· Pre – shift inspections

· Controls and instruments

· Coolant, fuel and lubrication systems

· Positioning of conveyers and hoppers

· Emergency stop operations

· Observing and controlling the outputs

  during crushing activities

· Shutting down and securing the machine

CPCS THEORY QUESTIONS A42 &A43

Test durations depends on joint theory and practical tests


Fiona@donaldmunro.co.uk for Training or Donald@donaldmunro.co.uk  for Plant Hire

                           Tel: 01863 766271   Fax: 01863 766077

©2017 by Donald Munro.